Project

Saubermacher ECOPORT

Saubermarcher Headquarters

Feldkirchen, Austria

2010–2011

Details
Status

Completed

Type

Office

Client

Roth Privatstiftung

Team

Arch. DI Alfred Bramberger

DI Verena Rippl

Arch. DI Hermann Sturmberger

Building Physics

DI Dr. Roland Müller

Domestic Engineering

Roth Installations GmbH

Electrical Engineering

Roth Handel & Bauhandwerkerservice GmbH

Site Supervision

Roth Baumanagement GmbH

Statics

Zivilingenieurbüro DI Dr. techn. Kurt Kratzer

Gross Building Area

7.000m²

Net Building Area

5.950m²

Links

www.saubermacher.at

www.thomaspucher.com

www.nextroom.at/building.php?id=36076

The building is conceived as a three dimensional space. Conceptually, it is clearly structured as a comb, offering the ideal sun exposure and the best possible organization of the working spaces. This comb-like structure is intercalated with open spaces –nature fingers – that penetrate deep into the interior of the building. The clear articulation of the building with its surrounding results in a compact object, as views from the outside. This statement of unity also reflects the feeling of community that it is intended for the users of the building.