Project

S35 Brucker Schnellstraße

Architecture support plan

Austria

2002–2010

Details
Status

Completed

Type

Infrastructural & Public Space

Client

ASFINAG Bau Management GmbH

Team

Arch. DI Alfred Bramberger

Arch. DI Rupert Richter-Trummer

DI Maria Richter-Trummer

Ing. Hans Waldhör

Anchor Wall Planning

Dorr-Schober & Partner Ziviltechniker GmbH

Competition

2002-05

Environmental Planning

Hugo Kofler

Maria Wiener

Road Engineering

Rinderer & Partner ZT KEG

Poltnigg & Klammer

Statics

Gerhard Meier (Tunnelportal)

Commencement

2003-09

Completion

2010-05

Cost

2.500.000 EUR

Awards

Bauherrenpreis 06

The architectural support plan for the section of the motorway S35 was the winner scheme of an invited competition. The concept of the design aims to offer the driver a feeling of gliding thought the street, where several design elements are integrated in this section, reinforcing the connection between the user and its environment. The reference to the landscape is always present and the project intends to highlight is as much as possible.
The portals of the tunnel are important moments in the project. These are marked by a canopy-like structure made of steel, that stands out from the landscape and simultaneous, the green steep slopes that cover it, integrating the tunnels in its surroundings. In the section next to the natural park of Mixnitz, transparent noise barriers were placed, so that the users can enjoy and connect with the outstanding landscape.

Construction phase North – Stausee Zlatten – Mautstatt : 6,315m
Construction phase South – Mautstatt – Rothelstein : 4,525 m

Scope of work: around 11 km of new highway , five tunnel portals , four operating stations , a green bridge , 5,887 linear meters of noise barriers , anchor walls , retaining wall panels , vegetation.